Last week, we successfully completed a mobilization on the BB Ocean. The bridge was equipped with a Viking Offshore Master system, along with two additional systems one installed in the OCM and another in the ROV control container. All systems are interconnected and operate within a unified network, allowing position fixes to be seamlessly shared and distributed across the entire setup. In addition, the GAPS USBL was deployed, configured, and fully interfaced with the system.
